“At The Four Seasons Resort Whistler, we installed two of the hybrid boilers to serve our 254-room hotel. In the first year of operations our hotel saved over $250,000 in heating costs. The boilers allowed the company to tap a lower-cost energy source while also reducing annual greenhouse gas emissions by more than 1,100 tonnes.”
Priyan Jayetileke, Director of Engineering
The Four Seasons Resort, Whistler, BC
Installation Completed September 2007
JUNE 15, 2006 - THE PROVINCE, VANCOUVER
“Since introducing the patent-pending system by Sempa Power Systems of West Vancouver, the Whistler
strata hotel has saved $110,000 in energy costs over its 2002-2003 baseline. Much of the savings is coming from lower energy costs to run its outdoor pools and hot tubs.”
“It is nice to see that this exceeded our expectations,”
said Ian Lowe, general manager of the Marriott, who had the system installed last year.